Develop LWM Plan & Technical Strategy

The first stage focuses on establishing a solid foundation through baseline data collection, stakeholder engagement, and the formulation of a technical strategy tailored to local conditions.

+

Baseline & Data Collection

  • Stakeholder Mapping
  • Primary Survey – Reconnaissance
  • Flow Measurement in Drains
  • Used Water Quality Analysis

Strategy Formulation

  • Identification of Problems/Challenges
  • Typologies of Greywater and Toilets
  • Formulation of Technical Strategies
  • Decision Matrix
02

State-Specific Survey Tool & Survey

This stage focuses on developing a comprehensive and standardized survey tool using the KoBo Collect App, along with training programs for master trainers and enumerators to ensure uniform data collection across the state.

+

Survey App Development

  • Development of Customised Survey App
  • 4 Steps to Conduct LWM Survey

Master Trainer Training

Enumerator Training

03

Village Action Plan (VAP) Development

This stage covers the state-wide rollout of the LWM survey, continuous data monitoring and cleaning, and the generation of detailed Village Action Plans with specific Drain End Point solutions for each village.

+

Survey Rollout

  • Village Assignment & Coverage
  • Field Monitoring & Progress Tracking
  • Coordination with Gram Panchayats

Data Monitoring & Cleaning

  • Dashboard Review & Validation
  • Error Correction & Re-verification

VAP Generation

  • DEP Solution Design
  • Cost Estimation
  • Geo-location & Documentation
04

Standard Drawings & Estimates

This stage covers the preparation of standard design drawings and cost estimates for all LWM solutions, along with capacity building of engineers for site-specific design adaptation.

+

Standard Drawings & Estimates

  • On-site Sanitation Systems (Soak Pits & Leach Pits)
  • Nature-Based Solutions (DEWATS & WSP)

Engineer Capacity Building

  • Design Interpretation & Customization
  • Site-Specific Adaptation
05

Budget Allocation & Implementation

The final stage involves engaging with the State Mission for budget allocation, securing funding approval through various government schemes, and providing technical assistance during implementation.

+

Engagement with State Mission

Funding Approval

  • MGNREGA
  • SBM(G)
  • 15th Finance Commission

Assistance in Implementation

  • Design Adaptation & Site Layout
  • Quality Assurance & Supervision
  • Technical Challenge Resolution